Works

TOP /Works /Outdoor Unit Cover Installation Work

Completion Date : June 2025

IndonesiaMembrane architecture

Outdoor Unit Cover Installation Work

We manufactured and installed an outdoor unit cover for the air conditioning system.
In Indonesia’s year-round tropical climate, outdoor units are constantly exposed to high temperatures. This time, we created a cover to protect them from intense sunlight.
By keeping the outdoor unit cooler, the efficiency of the air conditioning system has also improved.

Other Works

  • img

    NaraOthers

    Treatment Plant

  • img

    IndonesiaOthers

    New Rack Installation Work in the Factory

  • img

    IndonesiaMembrane architecture

    New Tent Warehouse Construction Project

  • img

    OsakaMembrane architecture

    New Tent Warehouse Construction: 12W × 20L × 5H

  • img

    IndonesiaMembrane architecture

    New Tent Warehouse Construction Project

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Plasma Frame

  • img

    TokyoMembrane architecture

    Roof Tent Scaffolding

  • img

    TokyoSteel frame

    Roof Tent Scaffolding