Works

TOP /Works /New Partition Installation Work in the Factory

Completion Date : June 2025

OsakaMembrane architecture

New Partition Installation Work in the Factory

Factory partition construction. New partition installation work due to factory layout changes. Flexible adaptation to factory layouts is possible.

Other Works

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Fly Ash Treatment Building

  • img

    IndonesiaMembrane architecture

    Rest Area: Openable Tent

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Factory Building

  • img

    HyogoMembrane architecture

    New Tent Canopy Installation: 4W × 16L × 5H

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Plasma Frame

  • img

    NaraOthers

    Treatment Plant

  • img

    TokyoMembrane architecture

    New Construction of Retractable Tent

  • img

    IndonesiaMembrane architecture

    Outdoor Unit Cover Installation Work