Works

TOP /Works /New Tent Warehouse Construction Project

Completion Date : January 2025

IndonesiaMembrane architecture

New Tent Warehouse Construction Project

We were selected to provide a tent warehouse for product storage. Although the construction period was short, approximately one month, we successfully completed the project.

Other Works

  • img

    HyogoMembrane architecture

    Newly installed aisle tent: 3W × 4.47L × 3H

  • img

    OsakaMembrane architecture

    New Partition Installation Work in the Factory

  • img

    SaitamaSteel frame

    Splash-proof Tent Scaffolding

  • img

    IndonesiaOthers

    Rack installation

  • img

    TokyoOthers

    Floor Construction

  • img

    HyogoMembrane architecture

    Replacement Work for Retractable Tents

  • img

    HyogoMembrane architecture

    Installation of New Partitions Inside Large Refrigerator

  • img

    HyogoMembrane architecture

    Folding Tent: 18W × 16L × 5.8H