Works

TOP /Works /New Tent Warehouse Construction Project

Completion Date : October 2023

IndonesiaMembrane architecture

New Tent Warehouse Construction Project

This is an ultra-large-scale project with a total floor area of approximately 2,000 square meters. To ensure comfortable working conditions in Indonesia’s year-round tropical climate, insulation was installed beneath the ceiling and electric ventilation fans were placed. This system maintains an average warehouse temperature of 28°C (82°F) even when the outside temperature exceeds 35°C (95°F).

Other Works

  • img

    IbarakiSteel frame

    New Ramp Construction Project

  • img

    IndonesiaMembrane architecture

    New Construction of Bellows-Style Tent

  • img

    OsakaMembrane architecture

    Installation of sunshade canopies at rest areas

  • img

    TokyoSteel frame

    Roof Tent Scaffolding

  • img

    OsakaMembrane architecture

    New Partition Installation Work in the Factory

  • img

    TokyoMembrane architecture

    Chimney footing

  • img

    HyogoMembrane architecture

    Existing Tent Warehouse Replacement: 5.5W × 38.25L × 7H

  • img

    NaraOthers

    Treatment Plant