Completion Date : July 2025
IndonesiaOthers
We performed rack installation work within the factory. To maximize the effective use of the limited space within the factory, we proposed rack selection and installation locations.




TokyoSteel frame

TokyoMembrane architecture

IndonesiaMembrane architecture

HyogoMembrane architecture

IbarakiSteel frame

IndonesiaOthers

OsakaMembrane architecture

OsakaMembrane architecture