Completion Date : July 2025
IndonesiaOthers
We performed rack installation work within the factory. To maximize the effective use of the limited space within the factory, we proposed rack selection and installation locations.




IndonesiaMembrane architecture

TokyoMembrane architecture

OsakaSteel frame

ChibaMembrane architecture

IndonesiaOthers

TokyoSteel frame

IbarakiSteel frame

IndonesiaMembrane architecture