Works

TOP /Works /Existing Tent Warehouse Replacement: 5.5W × 38.25L × 7H

Completion Date : April 2023

HyogoMembrane architecture

Existing Tent Warehouse Replacement: 5.5W × 38.25L × 7H

Membrane Replacement Work for Existing Tent Warehouse

Other Works

  • img

    TokyoMembrane architecture

    New Construction of Retractable Tent

  • img

    TokyoOthers

    Floor Construction

  • img

    TokyoMembrane architecture

    Roof Tent Scaffolding

  • img

    NaraOthers

    Treatment Plant

  • img

    HyogoMembrane architecture

    Folding Tent: 18W × 16L × 5.8H

  • img

    TokyoSteel frame

    Roof Tent Scaffolding

  • img

    IndonesiaMembrane architecture

    Outdoor Unit Cover Installation Work

  • img

    OsakaMembrane architecture

    New Partition Installation Work in the Factory