Works

TOP /Works /New Tent Warehouse Construction Project

Completion Date : October 2023

IndonesiaMembrane architecture

New Tent Warehouse Construction Project

This is an ultra-large-scale project with a total floor area of approximately 2,000 square meters. To ensure comfortable working conditions in Indonesia’s year-round tropical climate, insulation was installed beneath the ceiling and electric ventilation fans were placed. This system maintains an average warehouse temperature of 28°C (82°F) even when the outside temperature exceeds 35°C (95°F).

Other Works

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Plasma Frame

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Factory Building

  • img

    TokyoSteel frame

    Roof Tent Scaffolding

  • img

    IndonesiaOthers

    New Rack Installation Work in the Factory

  • img

    NaraOthers

    Treatment Plant

  • img

    HyogoMembrane architecture

    Folding Tent: 18W × 16L × 5.8H

  • img

    HyogoMembrane architecture

    Installation of New Partitions Inside Large Refrigerator

  • img

    OsakaSteel frame

    Cubicle Stand