Works

TOP /Works /New Tent Warehouse Construction Project

Completion Date : October 2023

IndonesiaMembrane architecture

New Tent Warehouse Construction Project

This is an ultra-large-scale project with a total floor area of approximately 2,000 square meters. To ensure comfortable working conditions in Indonesia’s year-round tropical climate, insulation was installed beneath the ceiling and electric ventilation fans were placed. This system maintains an average warehouse temperature of 28°C (82°F) even when the outside temperature exceeds 35°C (95°F).

Other Works

  • img

    OsakaSteel frame

    Cubicle Stand

  • img

    TokyoMembrane architecture

    Chimney footing

  • img

    ChibaMembrane architecture

    Roof Tent Scaffolding: Plasma Frame

  • img

    IndonesiaMembrane architecture

    New Tent Warehouse Construction Project

  • img

    HyogoMembrane architecture

    Replacement Work for Retractable Tents

  • img

    HyogoMembrane architecture

    New Tent Canopy Installation: 4W × 16L × 5H

  • img

    SaitamaSteel frame

    Splash-proof Tent Scaffolding

  • img

    TokyoSteel frame

    Roof Tent Scaffolding