Works

TOP /Works /Treatment Plant

Completion Date : August 2022

NaraOthers

Treatment Plant

Installation work for a wastewater treatment plant within a construction site

Other Works

  • img

    HyogoMembrane architecture

    Newly installed aisle tent: 3W × 4.47L × 3H

  • img

    SaitamaSteel frame

    Splash-proof Tent Scaffolding

  • img

    HyogoMembrane architecture

    Replacement Work for Retractable Tents

  • img

    OsakaSteel frame

    Cubicle Stand

  • img

    HyogoMembrane architecture

    New Tent Canopy Installation: 4W × 16L × 5H

  • img

    OsakaMembrane architecture

    New Tent Warehouse Construction: 12W × 20L × 5H

  • img

    HyogoMembrane architecture

    Existing Tent Warehouse Replacement: 5.5W × 38.25L × 7H

  • img

    HyogoMembrane architecture

    Folding Tent: 18W × 16L × 5.8H